A platform for research: civil engineering, architecture and urbanism
Completion of Fannich tunnel
Tunnel, nearly 4 mi long, is of horseshoe section with equivalent diameter of 11 ft; Grudie Bridge power station, together with this tunnel, forms North of Scotland Hydro-Electric Board's Constructional Scheme No 3, with annual output of 80 million units; construction methods described.
Completion of Fannich tunnel
Tunnel, nearly 4 mi long, is of horseshoe section with equivalent diameter of 11 ft; Grudie Bridge power station, together with this tunnel, forms North of Scotland Hydro-Electric Board's Constructional Scheme No 3, with annual output of 80 million units; construction methods described.
Completion of Fannich tunnel
Engineer
Engineer ; 190
1950
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Second Musconetcong tunnel nears completion
Engineering Index Backfile | 1928
|Long Capitol tunnel nears completion
Engineering Index Backfile | 1953
Completion of H-3 Highway Tunnel
British Library Conference Proceedings | 2001
|Completion of Moffat tunnel of Colorado
Engineering Index Backfile | 1931
|Completion of Moffat tunnel of Colorado
Engineering Index Backfile | 1930
|