A platform for research: civil engineering, architecture and urbanism
Gantry forms build soap Lake Siphon
System of railmounted gantries that carry movable forms is building 2 2 1/3-mi Soap Lake siphon of Columbia Basin irrigation project; contract involves 8252 ft of 22-ft diam pipe lined with cylinder of 1/4-in. steel plate, and 4632 ft of 25-ft diam reinforced pipe, unlined; slip forms are held in place during concrete pouring by combination of hydraulic and screw jacks, also used in stripping.
Gantry forms build soap Lake Siphon
System of railmounted gantries that carry movable forms is building 2 2 1/3-mi Soap Lake siphon of Columbia Basin irrigation project; contract involves 8252 ft of 22-ft diam pipe lined with cylinder of 1/4-in. steel plate, and 4632 ft of 25-ft diam reinforced pipe, unlined; slip forms are held in place during concrete pouring by combination of hydraulic and screw jacks, also used in stripping.
Gantry forms build soap Lake Siphon
Eng News-Rec
Engineering News-Record ; 143
1949
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1950
|Engineering Index Backfile | 1950
|TIBKAT | 1950
|Soap Lake Siphon Receives Rehabilitation
British Library Conference Proceedings | 1998
|