A platform for research: civil engineering, architecture and urbanism
Unusual overpass completed for city of New Orleans
Alternate rigid frame and cantilevered spans employed in 1212-ft long overpass; footings carried on 840 concrete filled steel shell piles; structure will provide two 36-ft roadways; new 16-E mobile paver aided in concreting piles and footings; mobile mixer with tower concreted deck, forms of steel being carried on heavy steel falsework girders; equipment and methods discussed.
Unusual overpass completed for city of New Orleans
Alternate rigid frame and cantilevered spans employed in 1212-ft long overpass; footings carried on 840 concrete filled steel shell piles; structure will provide two 36-ft roadways; new 16-E mobile paver aided in concreting piles and footings; mobile mixer with tower concreted deck, forms of steel being carried on heavy steel falsework girders; equipment and methods discussed.
Unusual overpass completed for city of New Orleans
Roads Streets
Roads and Streets ; 93
1950
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.