A platform for research: civil engineering, architecture and urbanism
High center traffic barrier installed on steep hill
Illustrated description of concrete barrier built on Route 22 in western New Jersey; it is designed to clear mudguards and running boards of cars that sideswipe curb and to deflect automobiles back onto roadway; it is 19 in. high, 30 in. wide at bottom and 7 in. wide at top; surface is of 2-in. white concrete.
High center traffic barrier installed on steep hill
Illustrated description of concrete barrier built on Route 22 in western New Jersey; it is designed to clear mudguards and running boards of cars that sideswipe curb and to deflect automobiles back onto roadway; it is 19 in. high, 30 in. wide at bottom and 7 in. wide at top; surface is of 2-in. white concrete.
High center traffic barrier installed on steep hill
Eng News-Rec
Engineering News-Record ; 144
1950
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Turbulence measurements on top of a steep hill
Elsevier | 1992
|The numerical computation of near-wall turbulent flow over a steep hill
Online Contents | 2008
|The numerical computation of near-wall turbulent flow over a steep hill
Elsevier | 2008
|