A platform for research: civil engineering, architecture and urbanism
Progress of south bank river wall
Status of work on bank of River Thames on Festival of Britain; methods used and difficulties encountered in building new river wall and reclaiming 4 1/2 acres of foreshore from river; wall was built of 6.1 and 8.1 weigh batched concrete. See also Engineering Index 1949 p 1017.
Progress of south bank river wall
Status of work on bank of River Thames on Festival of Britain; methods used and difficulties encountered in building new river wall and reclaiming 4 1/2 acres of foreshore from river; wall was built of 6.1 and 8.1 weigh batched concrete. See also Engineering Index 1949 p 1017.
Engineering Index Backfile | 1949
Engineering Index Backfile | 1949
River bank retaining wall and construction method thereof
European Patent Office | 2021
|Double-wall arrangement type river bank protection structure
European Patent Office | 2024
|Ecological gabion wall of waterfront river bank slow passage
European Patent Office | 2020
|