A platform for research: civil engineering, architecture and urbanism
Track stabilisation by sand piling
Unusual method for stabilization of soft clay track formation being tried out by Eastern Region of British Railways; operation consists of driving 9-in. diam steel spud into formation at number of points between ties, withdrawing on reaching specified depth and filling hole with sand. (see also Engineer v 188 n 4893 Nov 4 1949 p 521; Ry Gaz v 91 n 25 Dec 16 1949 p 704-5 (illus) 706; Civ Eng (Lond) v 45 n 523 Jan 1950 p 49)
Track stabilisation by sand piling
Unusual method for stabilization of soft clay track formation being tried out by Eastern Region of British Railways; operation consists of driving 9-in. diam steel spud into formation at number of points between ties, withdrawing on reaching specified depth and filling hole with sand. (see also Engineer v 188 n 4893 Nov 4 1949 p 521; Ry Gaz v 91 n 25 Dec 16 1949 p 704-5 (illus) 706; Civ Eng (Lond) v 45 n 523 Jan 1950 p 49)
Track stabilisation by sand piling
Engineering
Engineering ; 168
1949
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Track stabilisation by sand piling
Engineering Index Backfile | 1949
Track stabilisation by sand piling
Engineering Index Backfile | 1950
Track stabilisation by sand piling
Engineering Index Backfile | 1949