A platform for research: civil engineering, architecture and urbanism
Manchester-Sheffield-wath railway electrification
Scheme involves 75 mi of route and track mileage of 330, new single line tunnel 330 yd long at Thurgoland, and new double line tunnel under Pennines between Woodhead and Dunford Bridge constructed; 1500-v overhead collecting equipment being installed by British Insulated Callender's Cables, Ltd; motive power provided by 85 mixed traffic locomotives. (See also Engineering v 169 n 4387 Feb 24 1950 p 205-7; Engineer v 189 n 4909 Feb 24 1950 p 248-50)
Manchester-Sheffield-wath railway electrification
Scheme involves 75 mi of route and track mileage of 330, new single line tunnel 330 yd long at Thurgoland, and new double line tunnel under Pennines between Woodhead and Dunford Bridge constructed; 1500-v overhead collecting equipment being installed by British Insulated Callender's Cables, Ltd; motive power provided by 85 mixed traffic locomotives. (See also Engineering v 169 n 4387 Feb 24 1950 p 205-7; Engineer v 189 n 4909 Feb 24 1950 p 248-50)
Manchester-Sheffield-wath railway electrification
Ry Gaz
Railway Gazette ; 92
1950
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Manchester-Sheffield-wath railway electrification
Engineering Index Backfile | 1950
Manchester-Sheffield-wath railway electrification
Engineering Index Backfile | 1950
Tokstrip seals the Wath-Manvers drainage culvert
British Library Online Contents | 1992