A platform for research: civil engineering, architecture and urbanism
Use of special equipment for spillway repairs at Grand Coulee
Repair of eroded concrete in spillway bucket of Coulee Dam; work had to be done 70 ft below tailwater; illustrated description of floating caissons and other special equipment.
Use of special equipment for spillway repairs at Grand Coulee
Repair of eroded concrete in spillway bucket of Coulee Dam; work had to be done 70 ft below tailwater; illustrated description of floating caissons and other special equipment.
Use of special equipment for spillway repairs at Grand Coulee
Western Construction
Burrows, G.R. (author)
Western Construction ; 26
1951
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Unique caissons make spillway repairs possible at Grand Coulee
Engineering Index Backfile | 1946
|Grand Coulee floating caisson provides work chamber for spillway repairs
Engineering Index Backfile | 1950
Spillway erosion at Grand Coulee dam
Engineering Index Backfile | 1944
|Maintenance of spillway bucket of grand coulee dam
Engineering Index Backfile | 1945