A platform for research: civil engineering, architecture and urbanism
"World's busiest industrial street" repaved as high speed night job
Fort Street in Detroit resurfaced with 33,000 tons of asphaltic concrete, using 100% crushed limestone mix designed for high stability, placed in 5 working weeks, working after hours to minimize traffic interference; construction procedure.
"World's busiest industrial street" repaved as high speed night job
Fort Street in Detroit resurfaced with 33,000 tons of asphaltic concrete, using 100% crushed limestone mix designed for high stability, placed in 5 working weeks, working after hours to minimize traffic interference; construction procedure.
"World's busiest industrial street" repaved as high speed night job
Roads Streets
Roads and Streets ; 94
1951
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Lighting world's busiest highway
Engineering Index Backfile | 1947
|Jacking under Singapore's busiest street
Online Contents | 1993
|Jacking under Singapores busiest street
Tema Archive | 1993
|Night Paving with Asphalt is the Answer to Rehabilitating Runway at World's Busiest Airport
British Library Online Contents | 1997
Singapore retains title of "World's Busiest Port"
Online Contents | 2000