A platform for research: civil engineering, architecture and urbanism
Experience in construction of hydroelectric plants in areas of permafrost
Effect of climatological and engineering-geological conditions on construction of 250 Mw hydroelectric plant in area where mean temperature in January is -55 C and mean yearly temperature is -8.2 C; selection of structure materials and machinery.
Experience in construction of hydroelectric plants in areas of permafrost
Effect of climatological and engineering-geological conditions on construction of 250 Mw hydroelectric plant in area where mean temperature in January is -55 C and mean yearly temperature is -8.2 C; selection of structure materials and machinery.
Experience in construction of hydroelectric plants in areas of permafrost
Opyt stroitelstva gidrouzla v usloviyakh vechnoi merzloty
Biyanov, G.F. (author)
1965
8 pages
Article (Journal)
Russian
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of piottino hydroelectric power plants
Engineering Index Backfile | 1930
The construction of modern hydroelectric plants
Engineering Index Backfile | 1922
|Construction of the Kuban’-Kalaus hydroelectric plants
Springer Verlag | 1968
|Studies determine proper construction procedures in permafrost areas
Engineering Index Backfile | 1947
Construction of the Kuban’-Kalaus hydroelectric plants
Online Contents | 1968
|