A platform for research: civil engineering, architecture and urbanism
Cast-in-place concrete connects precast members
Prestressed structural T's with tops 8 ft wide, were spaced at 15 ft on centers to roof commercial building; bolts through T's and temporary shares supported beams during erection; precast slabs 2 in. thick and 8 ft long -- with prestressing wires protruding 12 in. at each end -- were laid across 7-ft opening; then cast-in-place concrete was placed over T's to bond roof slabs and T's into rigid unit; saving of 1 dollar/sq ft is claimed for this type of construction.
Cast-in-place concrete connects precast members
Prestressed structural T's with tops 8 ft wide, were spaced at 15 ft on centers to roof commercial building; bolts through T's and temporary shares supported beams during erection; precast slabs 2 in. thick and 8 ft long -- with prestressing wires protruding 12 in. at each end -- were laid across 7-ft opening; then cast-in-place concrete was placed over T's to bond roof slabs and T's into rigid unit; saving of 1 dollar/sq ft is claimed for this type of construction.
Cast-in-place concrete connects precast members
Civ Eng (NY)
Erech, S.A. (author)
1966
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Post-tensioning connects precast concrete members
Engineering Index Backfile | 1962
|Composite construction in precast and cast-in-place concrete
Engineering Index Backfile | 1960
|European Patent Office | 2017
|Precast concrete block cast-in-place greening concrete mixed construction method
European Patent Office | 2022
|Wall built of precast units and cast-in-place concrete
Engineering Index Backfile | 1949
|