A platform for research: civil engineering, architecture and urbanism
In-factory or on-site for concreting
Balency-MBM system emphasizing industrialization of building process combines and uses offsite and on-site fabrication in completely programmed and coordinated flow of production; European method of complete industrial production of load-bearing building shells of reinforced concrete; shell includes all exterior walls (insulated), interior walls or partitions, slabs and stairs; shell may also be equipped with integrated electric, heating, ventilating and plumbing systems.
In-factory or on-site for concreting
Balency-MBM system emphasizing industrialization of building process combines and uses offsite and on-site fabrication in completely programmed and coordinated flow of production; European method of complete industrial production of load-bearing building shells of reinforced concrete; shell includes all exterior walls (insulated), interior walls or partitions, slabs and stairs; shell may also be equipped with integrated electric, heating, ventilating and plumbing systems.
In-factory or on-site for concreting
Arch Rec
Rothenstein, G.G. (author)
Architectural Record ; 139
1966
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Off-site concreting cuts open-water hazards
Engineering Index Backfile | 1953
Engineering Index Backfile | 1937
|