A platform for research: civil engineering, architecture and urbanism
Tunnel supports span 113 Feet
Construction of 500 ft sloping transition part of spillway tunnels of large hydroelectric project; cross section changes continuously in size and shape and ends in smaller circular cross section; changing elevations of roof, spring and flow lines are exponential curves and each has different formula; structural steel sections over-span 113 ft; groups of steel ribs are separately tied to rock to avoid accumulation of thrust; excavation and blasting.
Tunnel supports span 113 Feet
Construction of 500 ft sloping transition part of spillway tunnels of large hydroelectric project; cross section changes continuously in size and shape and ends in smaller circular cross section; changing elevations of roof, spring and flow lines are exponential curves and each has different formula; structural steel sections over-span 113 ft; groups of steel ribs are separately tied to rock to avoid accumulation of thrust; excavation and blasting.
Tunnel supports span 113 Feet
Eng News -- Rec
Engineering News-Record ; 163
1959
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1952
Engineering Index Backfile | 1952
Steel road bridge, 150 feet clear span
Engineering Index Backfile | 1897
New steel bridge, 200 feet main span
Engineering Index Backfile | 1941
|New steel bridge, 200 feet main span
Engineering Index Backfile | 1941
|