A platform for research: civil engineering, architecture and urbanism
Three-hundred-mile new construction by C.N.R.
Construction of new line by Canadian National Railways in Northern Quebec, includes 161-mi section between Beattyville and Chibougamau and 133-mi section between St. Felicien and Chibougamau; particular reference is made to methods used for bridge construction on both lines; map shows new loop in relation to other lines. (See also - n 24 Dec 12 1958 p 714-15)
Three-hundred-mile new construction by C.N.R.
Construction of new line by Canadian National Railways in Northern Quebec, includes 161-mi section between Beattyville and Chibougamau and 133-mi section between St. Felicien and Chibougamau; particular reference is made to methods used for bridge construction on both lines; map shows new loop in relation to other lines. (See also - n 24 Dec 12 1958 p 714-15)
Three-hundred-mile new construction by C.N.R.
Ry Gaz
Railway Gazette ; 190
1958
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
|Construction features of new Winnipeg C.N.R. building
Engineering Index Backfile | 1942
Engineering Index Backfile | 1946
Montreal terminal improvement project revived by C.N.R.
Engineering Index Backfile | 1939
New C.N.R. bridge at Fredericton
Engineering Index Backfile | 1939