A platform for research: civil engineering, architecture and urbanism
Placing concrete lining in 19-Ft tunnel
Concrete lining in 28,200 ft Pit River No 5 hydroelectric tunnel; sequence in placing successive portions of lining and use of high wall pours saved critical time; steel forms for arch that had been used on another tunnel were rebuilt into self-supporting collapsible type well suited to this job.
Placing concrete lining in 19-Ft tunnel
Concrete lining in 28,200 ft Pit River No 5 hydroelectric tunnel; sequence in placing successive portions of lining and use of high wall pours saved critical time; steel forms for arch that had been used on another tunnel were rebuilt into self-supporting collapsible type well suited to this job.
Placing concrete lining in 19-Ft tunnel
Eng News-Rec
Engineering News-Record ; 131
1943
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Placing concrete lining in highway tunnel
Engineering Index Backfile | 1941
Method of mixing and placing concrete for a tunnel lining
Engineering Index Backfile | 1907
European Patent Office | 2024
|Machine for placing concrete lining in canal
Engineering Index Backfile | 1916
|European Patent Office | 2024
|