A platform for research: civil engineering, architecture and urbanism
Chlorine -- Critical material solves critical problem
Manner in which Little Rock Municipal Water Works, Little Rock, Ark, re-established design capacity of vital supply line; in 1 yr of operation, capacity of vital flow line was reduced 20% by organic growth which could have been prevented had sterilization facilities at head of supply line been included in original design; from 3 yr experience "breakpoint" superchlorination has proven most effective treatment.
Chlorine -- Critical material solves critical problem
Manner in which Little Rock Municipal Water Works, Little Rock, Ark, re-established design capacity of vital supply line; in 1 yr of operation, capacity of vital flow line was reduced 20% by organic growth which could have been prevented had sterilization facilities at head of supply line been included in original design; from 3 yr experience "breakpoint" superchlorination has proven most effective treatment.
Chlorine -- Critical material solves critical problem
Water Works Sewerage
Jackson, L.A. (author) / Mayhan, W.A. (author)
1943
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Deep well solves critical water problem on northern pacific
Engineering Index Backfile | 1941
|Modeling solves ultrahard material problem
British Library Online Contents | 2017
|Modeling solves ultrahard material problem
British Library Online Contents | 2017
|Online Contents | 1997
Engineering Index Backfile | 1960