A platform for research: civil engineering, architecture and urbanism
C. and O. replaces 1850 Blue Ridge tunnel
Need for larger tunnel to permit passage of more powerful engines and large loads prompted construction of 4000 ft tunnel through Blue Ridge Mountains on C. and O. Ry; it will replace tunnel, largely unlined, started in 1850 and in service for 84 yr. (see also Compressed Air Mag v 48 n 9 Sept 1943 p 7182-5; Ry Gaz v 79 n 14 Oct 1 1943 p 332)
C. and O. replaces 1850 Blue Ridge tunnel
Need for larger tunnel to permit passage of more powerful engines and large loads prompted construction of 4000 ft tunnel through Blue Ridge Mountains on C. and O. Ry; it will replace tunnel, largely unlined, started in 1850 and in service for 84 yr. (see also Compressed Air Mag v 48 n 9 Sept 1943 p 7182-5; Ry Gaz v 79 n 14 Oct 1 1943 p 332)
C. and O. replaces 1850 Blue Ridge tunnel
Eng News-Rec
Engineering News-Record ; 131
1943
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
C. and O. replaces 1850 Blue Ridge tunnel
Engineering Index Backfile | 1943
C. and O. replaces 1850 Blue Ridge tunnel
Engineering Index Backfile | 1943
Deep cut replaces old railroad tunnel
Engineering Index Backfile | 1943
|Deep open cut replaces railroad tunnel
Engineering Index Backfile | 1930
Uniting the Commonwealth: The Blue Ridge Tunnel
ASCE | 2016
|