A platform for research: civil engineering, architecture and urbanism
Seven grade crossings eliminated by 3 1/2-mile route change
As result of project involving relocation of 3 1/2 mi of New York Central's 4-track main line at Herkimer, NY, tracks have been removed from heart of village to outskirts, and 7 important grade crossings have been eliminated; details of project which involved construction of about 14 mi of track, passenger station, and five bridges.
Seven grade crossings eliminated by 3 1/2-mile route change
As result of project involving relocation of 3 1/2 mi of New York Central's 4-track main line at Herkimer, NY, tracks have been removed from heart of village to outskirts, and 7 important grade crossings have been eliminated; details of project which involved construction of about 14 mi of track, passenger station, and five bridges.
Seven grade crossings eliminated by 3 1/2-mile route change
Ry Age
Railway Age ; 115
1943
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Railroad grade crossings eliminated in El Paso, Texas
Engineering Index Backfile | 1949
|390 Grade crossings eliminated from federal highways in 1928
Engineering Index Backfile | 1929
New tunnel eliminates seven grade crossings
Engineering Index Backfile | 1932
|Online Contents | 2012
Online Contents | 1996