A platform for research: civil engineering, architecture and urbanism
Treated timber at Isabella mine
Illustrations and description of number of ways in which pressure treated timber is serving mine of Weirton Coal Co in western Pennsylvania, by maintaining main haulage entries and air courses; crossbars, beams, lagging and track ties are treated with chromated zinc chloride, impregnated under pressure with net retention of 3/4 lb per cu ft of timber.
Treated timber at Isabella mine
Illustrations and description of number of ways in which pressure treated timber is serving mine of Weirton Coal Co in western Pennsylvania, by maintaining main haulage entries and air courses; crossbars, beams, lagging and track ties are treated with chromated zinc chloride, impregnated under pressure with net retention of 3/4 lb per cu ft of timber.
Treated timber at Isabella mine
Min Congress J
1943
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Treated timber for mine roof support
Engineering Index Backfile | 1942
Mine roof, treated timber and simple arithmetic
Engineering Index Backfile | 1949
|Engineering Index Backfile | 1927
|Engineering Index Backfile | 1923
|Treated timber requirements from viewpoint of coal mine operator
Engineering Index Backfile | 1936
|