A platform for research: civil engineering, architecture and urbanism
While it is possible to build brick or concrete underground chamber that will remain dry if built in suitable ground, it is necessary to use cast iron tubbing to obtain this condition where subsoil water level is near ground surface or where bad ground is likely to be met; tubbings can be built of either segments or solid rings; construction procedure described and illustrated, with special reference to tubbing for housing of sewage ejectors. (See also Junior Instn Engrs -- J v 53 Part 8 May 1943 p 199-208)
While it is possible to build brick or concrete underground chamber that will remain dry if built in suitable ground, it is necessary to use cast iron tubbing to obtain this condition where subsoil water level is near ground surface or where bad ground is likely to be met; tubbings can be built of either segments or solid rings; construction procedure described and illustrated, with special reference to tubbing for housing of sewage ejectors. (See also Junior Instn Engrs -- J v 53 Part 8 May 1943 p 199-208)
Sinking and erection of cast-iron tubbings
Civ Eng (Lond)
Hatt, H.A. (author)
1943
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Sinking and erection of cast-iron tubbings
Engineering Index Backfile | 1943
|TIBKAT | 1991
|TIBKAT | 1989
|Aktuelle Entwicklungen bei der Ausführungsplanung von Tübbings
Tema Archive | 2011
|Tunnelbau - Höchste Anforderungen an Tübbings der vierten Elbtunnelröhre
Online Contents | 2000
|