A platform for research: civil engineering, architecture and urbanism
Report on construction methods used for erection of three span, 840 ft continuous plate girder, which includes longest girder span in United States; piles for falsework bent foundations were driven through heavy steel bracing cages; grid deck was filled with concrete by paver serviced by batch trucks operating directly on grid.
Report on construction methods used for erection of three span, 840 ft continuous plate girder, which includes longest girder span in United States; piles for falsework bent foundations were driven through heavy steel bracing cages; grid deck was filled with concrete by paver serviced by batch trucks operating directly on grid.
Plate-girder erection at Hartford
Eng News-Rec
Boynton, R.M. (author)
Engineering News-Record ; 130
1943
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Bridge girder erection machine and via hole girder erection method of bridge girder erection machine
European Patent Office | 2024
|European Patent Office | 2024
|Bridge girder erection machine and via hole girder erection method of bridge girder erection machine
European Patent Office | 2024
|The erection of large plate girder spans
Engineering Index Backfile | 1899
|Rotary support applied to curved girder erection bridge girder erection machine
European Patent Office | 2022
|