A platform for research: civil engineering, architecture and urbanism
Barge places 90-ton breakwater blocks
Special barge to transport and place 90-ton concrete blocks, was designed for construction of 3300-ft breakwater in Portugal; tipping car, operating on rails set below deck level, employed system of screw jacks to dump blocks over end of overhanging beam and into position in breakwater.
Barge places 90-ton breakwater blocks
Special barge to transport and place 90-ton concrete blocks, was designed for construction of 3300-ft breakwater in Portugal; tipping car, operating on rails set below deck level, employed system of screw jacks to dump blocks over end of overhanging beam and into position in breakwater.
Barge places 90-ton breakwater blocks
Eng News-Rec
Cruttwell, C.H. (author)
Engineering News-Record ; 131
1943
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Barge places 90-ton breakwater blocks
Engineering Index Backfile | 1943
|Making concrete blocks for Toronto breakwater
Engineering Index Backfile | 1919
|HYDROPHILIC PERMEABLE BREAKWATER AND SEAWALL USING PREFABRICATED BLOCKS
European Patent Office | 2016
|Structure to prevent loss of breakwater blocks including tetrapods
European Patent Office | 2024
|Light breakwater based on three-dimensional assembly type blocks
European Patent Office | 2023
|