A platform for research: civil engineering, architecture and urbanism
Grand duchess charlotte bridge in Luxembourg
Bridge nearing completion is 335 m long steel structure over Alzette valley, connecting plateaus of Limpertsberg and Kirchberg, and is part of trunk road system; bridge crosses valley at maximum height of 75 m; distance between bases of two pairs of supports is 234.10 m; method of erection is indicated.
Grand duchess charlotte bridge in Luxembourg
Bridge nearing completion is 335 m long steel structure over Alzette valley, connecting plateaus of Limpertsberg and Kirchberg, and is part of trunk road system; bridge crosses valley at maximum height of 75 m; distance between bases of two pairs of supports is 234.10 m; method of erection is indicated.
Grand duchess charlotte bridge in Luxembourg
Engineer
Engineer ; 221
1966
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Grand-Duchess Charlotte bridge at Luxembourg
Engineering Index Backfile | 1966
Grand Duchess Charlotte Bridgein Luxembourg
Engineering Index Backfile | 1967
Grand duchess charlotte bridge at Luxemburg
Engineering Index Backfile | 1965
|Philharmonie Grande Duchesse Charlotte, Luxembourg
British Library Online Contents | 2006
|Engineering Index Backfile | 1904
|