A platform for research: civil engineering, architecture and urbanism
Bridge is first prestressed concrete truss in Europe; 306.6-m long with spans of 72.6, 84.9, 89.9 and 35.8-m each on 20-m piles 25-m above valley floor; prefabricated sections, 26 of which are standard size, weighing 180 tons, 8.5-m long and 14-m wide, were slid in place supported by falsework and given ultimate stress by prestressing cables according to Baur-Leonhardt method; details on concrete mix, reinforcement and method of casting.
Bridge is first prestressed concrete truss in Europe; 306.6-m long with spans of 72.6, 84.9, 89.9 and 35.8-m each on 20-m piles 25-m above valley floor; prefabricated sections, 26 of which are standard size, weighing 180 tons, 8.5-m long and 14-m wide, were slid in place supported by falsework and given ultimate stress by prestressing cables according to Baur-Leonhardt method; details on concrete mix, reinforcement and method of casting.
Ager River Bridge in Upper Austria
Die Agerbruecke in Oberoesterreich
Keith, J. (author)
Tiefbau ; 8
1966
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Hydroelectric plant on river ager at lenzing, upper Austria
Engineering Index Backfile | 1926
|Prestressed concrete bridge built at Ager (Austria) from large precast members
Engineering Index Backfile | 1963
|Preventive strengthening and rehabilitation of the Ager-bridge
Online Contents | 1998
|DataCite | 2018
|Preventive strengthening and rehabilitation of the Ager-bridge
British Library Online Contents | 1998
|