A platform for research: civil engineering, architecture and urbanism
Prestressed concrete bridge built at Ager (Austria) from large precast members
29.10 m wide bridge with 4 spans 72.6, 84.9, 84.9 and 35.8 m was built from 8.5 m long precast box segments moved along scaffold slideway to proper position; completed assembly is supported by prestressed suspension cables fastened to side walls of elements.
Prestressed concrete bridge built at Ager (Austria) from large precast members
29.10 m wide bridge with 4 spans 72.6, 84.9, 84.9 and 35.8 m was built from 8.5 m long precast box segments moved along scaffold slideway to proper position; completed assembly is supported by prestressed suspension cables fastened to side walls of elements.
Prestressed concrete bridge built at Ager (Austria) from large precast members
Die Agerbruecke, eine aus Gross-Fertigteilen zusammengesetzte Spannbetonbruecke
Leonhardt, F. (author) / Baur, W. (author)
Bautechnik ; 40
1963
5 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Ager River Bridge in Upper Austria
Engineering Index Backfile | 1966
|Precast prestressed concrete rail bridge
Engineering Index Backfile | 1947
Precast prestressed concrete rail bridge
Engineering Index Backfile | 1947
Precast, prestressed concrete members in Tampa Bay toll bridge project
Engineering Index Backfile | 1953
Construction of Foot over Bridge (F.O.B) using Precast prestressed Concrete Members
British Library Conference Proceedings | 1999
|