A platform for research: civil engineering, architecture and urbanism
Difficulties in long tunnel for Japanese railways
5-mile Tanna tunnel meets rock faults; heavy water flow requires separate drain tunnel; progress record.
Difficulties in long tunnel for Japanese railways
5-mile Tanna tunnel meets rock faults; heavy water flow requires separate drain tunnel; progress record.
Difficulties in long tunnel for Japanese railways
Eng. News-Rec
Kusuda, K. (author)
1925
3 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of Hokuriku tunnel, Japanese national railways
Engineering Index Backfile | 1962
Engineering Index Backfile | 1896
|Reinforced concrete on Japanese railways
Engineering Index Backfile | 1930
Difficulties of tunnel building
Engineering Index Backfile | 1892
|Rimutaka tunnel, New Zealand railways
Engineering Index Backfile | 1955