A platform for research: civil engineering, architecture and urbanism
Construction of Hokuriku tunnel, Japanese national railways
Design and construction techniques of fifth longest railroad tunnel in world; tunnel is double-line structure over 8 1/2 mt long, and is equipped with a-c traction overhead wiring; its construction was completed after 4 1/2-yr battle against geological conditions involving gushing water at frequent intervals.
Construction of Hokuriku tunnel, Japanese national railways
Design and construction techniques of fifth longest railroad tunnel in world; tunnel is double-line structure over 8 1/2 mt long, and is equipped with a-c traction overhead wiring; its construction was completed after 4 1/2-yr battle against geological conditions involving gushing water at frequent intervals.
Construction of Hokuriku tunnel, Japanese national railways
Ry Gaz
Railway Gazette ; 117
1962
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Difficulties in long tunnel for Japanese railways
Engineering Index Backfile | 1925
|Rapid excavation of a long mountain tunnel - Gorigamine tunnel on the Hokuriku Shinkansen
British Library Conference Proceedings | 1997
|Design and Construction of Kazura Bridge, Tokai-Hokuriku Expressway
British Library Conference Proceedings | 2002
|Design and Construction of Kazura Bridge, Tokai-Hokuriku Expressway
British Library Conference Proceedings | 2002
|Hokuriku-Koshu-Eisei-Gakkai-shi
TIBKAT | Nachgewiesen 17.1990 -
|