A platform for research: civil engineering, architecture and urbanism
Construction particulars. Twenty-four-inch water main carried under river in seven-foot tunnel, excavated with pneumatic shovels; constructing 2,000,000-gal. circular reservoir of reinforced concrete.
Construction particulars. Twenty-four-inch water main carried under river in seven-foot tunnel, excavated with pneumatic shovels; constructing 2,000,000-gal. circular reservoir of reinforced concrete.
Calumet reservoir and tunnel
Pub. Wks
Clark, E.A. (author)
Public Works ; 56
1925
4 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1996
Calumet Tunnel Project, A Case History
British Library Conference Proceedings | 1995
|Little Calumet Leg Sewer Tunnel in Chicago/USA
British Library Online Contents | 2003
|Calumet River lock, Calumet-Sag Project, Illinois
Engineering Index Backfile | 1958
|British Library Conference Proceedings | 2011
|