A platform for research: civil engineering, architecture and urbanism
Highway bridge over the Isar river at Unterfohring (Germany)
Concrete cantilever bridge built of high early-strength cement (Dyckerhoff-Doppel); use of this cement made it possible to strip forms in each span after 5 days and permitted completion of entire structure in 2 1/2 months' working time. (abstracted translation) (See also Bauingenieur, vol. 6, no. 11, June 10, 1925, pp. 415-417, 5 figs.)
Highway bridge over the Isar river at Unterfohring (Germany)
Concrete cantilever bridge built of high early-strength cement (Dyckerhoff-Doppel); use of this cement made it possible to strip forms in each span after 5 days and permitted completion of entire structure in 2 1/2 months' working time. (abstracted translation) (See also Bauingenieur, vol. 6, no. 11, June 10, 1925, pp. 415-417, 5 figs.)
Highway bridge over the Isar river at Unterfohring (Germany)
Strassenbrucke uber die Isar bei Unterfohring
1925
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Highway bridge over the Isar river at Unterfohring (Germany)
Engineering Index Backfile | 1925
Reconstruction of bridge over Isar River at Gruenwald, Germany
Engineering Index Backfile | 1950
|Online Contents | 1998
Temporary highway bridge over Lahn river at Limburg, Germany
Engineering Index Backfile | 1950
|Prestressed highway bridge over Ruhr river at Frondenberg, Germany
Engineering Index Backfile | 1954
|