A platform for research: civil engineering, architecture and urbanism
Highway bridge over the Isar river at Unterfohring (Germany)
Concrete cantilever bridge built of high early-strength cement (Dyckerhoff-Doppel); use of this cement made it possible to strip forms in each span after 5 days and permitted completion of entire structure in 2 1/2 months' working time. (See also abstracted translation in Eng. News-Rec., vol. 95, no. 21, Nov. 19, 1925, p. 840, 1 fig.)
Highway bridge over the Isar river at Unterfohring (Germany)
Concrete cantilever bridge built of high early-strength cement (Dyckerhoff-Doppel); use of this cement made it possible to strip forms in each span after 5 days and permitted completion of entire structure in 2 1/2 months' working time. (See also abstracted translation in Eng. News-Rec., vol. 95, no. 21, Nov. 19, 1925, p. 840, 1 fig.)
Highway bridge over the Isar river at Unterfohring (Germany)
Strassenbrucke uber die Isar bei Unterfohring
Bauingenieur ; 6
1925
3 pages
5 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Highway bridge over the Isar river at Unterfohring (Germany)
Engineering Index Backfile | 1925
Reconstruction of bridge over Isar River at Gruenwald, Germany
Engineering Index Backfile | 1950
|Online Contents | 1998
Temporary highway bridge over Lahn river at Limburg, Germany
Engineering Index Backfile | 1950
|Prestressed highway bridge over Ruhr river at Frondenberg, Germany
Engineering Index Backfile | 1954
|