A platform for research: civil engineering, architecture and urbanism
How to excavate 771 foot high cut under traffic
Experiences of mountain canyon construction and techniques used in building grade and road surface in Wolf Creek Canyon, Mont; stream, railroad, and highway are spaced at bottom of canyon.
How to excavate 771 foot high cut under traffic
Experiences of mountain canyon construction and techniques used in building grade and road surface in Wolf Creek Canyon, Mont; stream, railroad, and highway are spaced at bottom of canyon.
How to excavate 771 foot high cut under traffic
Roads Streets
Glidden, H.K. (author)
Roads and Streets ; 106
1963
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Researchers Report Progress In Reducing Need To Excavate
Online Contents | 1996
How to excavate 25 ft. below Water Level
Engineering Index Backfile | 1965
System and method to excavate using pneumatic shock wave
European Patent Office | 2016
|