A platform for research: civil engineering, architecture and urbanism
Rate fixing in civil engineering contracts
Outline of factors to be taken into account by engineer when fixing rates for varied or additional works; 3 examples concerning excavation, concrete and shuttering show typical "make-ups" of schedule rates for tender for civil engineering works; in these examples on-cost percentages of 70, 10 and 5 are applied to labor, materials and plant contents, respectively; variations introduced in these items subsequent to award of contract, their effect upon original calculations and rates, and resultant creation of new items. (See also Instn Civ Engrs -- Proc v 24 n 3695 Feb 1963 p 223-34)
Rate fixing in civil engineering contracts
Outline of factors to be taken into account by engineer when fixing rates for varied or additional works; 3 examples concerning excavation, concrete and shuttering show typical "make-ups" of schedule rates for tender for civil engineering works; in these examples on-cost percentages of 70, 10 and 5 are applied to labor, materials and plant contents, respectively; variations introduced in these items subsequent to award of contract, their effect upon original calculations and rates, and resultant creation of new items. (See also Instn Civ Engrs -- Proc v 24 n 3695 Feb 1963 p 223-34)
Rate fixing in civil engineering contracts
Surveyor
Haswell, C.K. (author)
Surveyor ; 122
1963
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Rate fixing in civil engineering contracts
Engineering Index Backfile | 1963
|Elsevier | 1991
|Conditions for civil engineering contracts
Engineering Index Backfile | 1946
|Tabular summary of civil engineering contracts
UB Braunschweig | Nachgewiesen 1950(1951) - 1963
Contracts in the civil engineering industry
British Library Online Contents | 2006