A platform for research: civil engineering, architecture and urbanism
Design and construction procedures used in Banco Central building in San Jose, Costa Rica; multistory prestressed concrete structure combined pretensioned members and cast-in-place post tensioning; entire structure was connected by post tensioning to provide rigid frame; floor system is made up of precast pretensioned joists and 2 in. thick slab cast in place simultaneously with main girders to provide rigidity and monolithic characteristics of structure.
Design and construction procedures used in Banco Central building in San Jose, Costa Rica; multistory prestressed concrete structure combined pretensioned members and cast-in-place post tensioning; entire structure was connected by post tensioning to provide rigid frame; floor system is made up of precast pretensioned joists and 2 in. thick slab cast in place simultaneously with main girders to provide rigidity and monolithic characteristics of structure.
Post-tensioned multistory rigid frames
Prestressed Concrete Inst -- J
Sauter, F. (author)
1963
11 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Post-tensioned cast-in-place multistory building frame
Engineering Index Backfile | 1966
|Analysis of unbraced multistory steel rigid frames
Engineering Index Backfile | 1968
|Steel column design for multistory rigid frames
Engineering Index Backfile | 1963
|Inelastic stability of multistory, multibay rigid frames
Engineering Index Backfile | 1968
|Seismic behavior of post-tensioned steel frames
British Library Conference Proceedings | 2000
|