A platform for research: civil engineering, architecture and urbanism
Work carried out to stabilize ground below headgear abutments and consolidation of hoisting engine foundation at British mine; injection holes were drilled in 3 phases -- vertical holes into ground about 2 ft away from abutments, raking holes into abutments from surface, and horizontal holes into abutments from inside shaft -- drilled off top of cage; neat cement was used for fine fissures; portland cement was used when sulfates were encountered.
Work carried out to stabilize ground below headgear abutments and consolidation of hoisting engine foundation at British mine; injection holes were drilled in 3 phases -- vertical holes into ground about 2 ft away from abutments, raking holes into abutments from surface, and horizontal holes into abutments from inside shaft -- drilled off top of cage; neat cement was used for fine fissures; portland cement was used when sulfates were encountered.
Consolidation grouting at Cortonwood colliery
Colliery Guardian
Kaye, R.D. (author)
Colliery Guardian ; 206
1963
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Conference Proceedings | 1993
|Consolidation of rock by grouting
Engineering Index Backfile | 1966
|Underground space consolidation grouting equipment and grouting method thereof
European Patent Office | 2023
|Consolidation of embankments by cement grouting
Engineering Index Backfile | 1931
|GROUND CONSOLIDATION MATERIAL AND GROUTING METHOD THEREWITH
European Patent Office | 2024
|