Consolidation grouting at Cortonwood colliery
Work carried out to stabilize ground below headgear abutments and consolidation of hoisting engine foundation at British mine; injection holes were drilled in 3 phases -- vertical holes into ground about 2 ft away from abutments, raking holes into abutments from surface, and horizontal holes into abutments from inside shaft -- drilled off top of cage; neat cement was used for fine fissures; portland cement was used when sulfates were encountered.
Consolidation grouting at Cortonwood colliery
Work carried out to stabilize ground below headgear abutments and consolidation of hoisting engine foundation at British mine; injection holes were drilled in 3 phases -- vertical holes into ground about 2 ft away from abutments, raking holes into abutments from surface, and horizontal holes into abutments from inside shaft -- drilled off top of cage; neat cement was used for fine fissures; portland cement was used when sulfates were encountered.
Consolidation grouting at Cortonwood colliery
Colliery Guardian
Kaye, R.D. (Autor:in)
Colliery Guardian ; 206
1963
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Conference Proceedings | 1993
|Consolidation of rock by grouting
Engineering Index Backfile | 1966
|Underground space consolidation grouting equipment and grouting method thereof
Europäisches Patentamt | 2023
|Consolidation of embankments by cement grouting
Engineering Index Backfile | 1931
|Preparation method of mining grouting consolidation material