A platform for research: civil engineering, architecture and urbanism
Design and construction of superstructure of Medway bridge
Design and construction methods of unusual Medway Bridge in Great Britain; bridge with approach spans has total length of 3272 ft including 500 ft center span; cantilever construction method was employed on 3 main spans; river spans are made up of 2 512 ft 6 in. anchor girders cantilevered 200 ft into navigation span and supporting 100 ft suspended span.
Design and construction of superstructure of Medway bridge
Design and construction methods of unusual Medway Bridge in Great Britain; bridge with approach spans has total length of 3272 ft including 500 ft center span; cantilever construction method was employed on 3 main spans; river spans are made up of 2 512 ft 6 in. anchor girders cantilevered 200 ft into navigation span and supporting 100 ft suspended span.
Design and construction of superstructure of Medway bridge
Prestressed Concrete Inst -- J
Kerensky, O.A. (author)
1963
17 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of Medway bridge -- Approach viaducts
Engineering Index Backfile | 1963
BRIDGE DESIGN AND CONSTRUCTION - Rapid progression on the Medway Bridge
Online Contents | 2002
|Construction of Medway bridge -- Main spans
Engineering Index Backfile | 1963
The Design of the New Medway Bridge
British Library Conference Proceedings | 2003
|Engineering Index Backfile | 1962