A platform for research: civil engineering, architecture and urbanism
Some notes on sewerage design and construction
Flow per head per day usually assumed to be 30 gal; rainfall of 1 in. per hr per impermeable acre yields runoff of 1 cu sec which corresponds to foul water runoff from 428 acres with 21 people per acre; practical hints for design and construction.
Some notes on sewerage design and construction
Flow per head per day usually assumed to be 30 gal; rainfall of 1 in. per hr per impermeable acre yields runoff of 1 cu sec which corresponds to foul water runoff from 428 acres with 21 people per acre; practical hints for design and construction.
Some notes on sewerage design and construction
Surveyor
Gough, P.M. (author)
1949
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1907
Some notes on the borough of Poole and its sewerage
Engineering Index Backfile | 1927
|Some factors in design of sewerage schemes
Engineering Index Backfile | 1934
|Some details of the design and construction of the Baltimore sewerage system
Engineering Index Backfile | 1908
Design and construction of tinsley sewerage scheme, Sheffield
Engineering Index Backfile | 1953
|