A platform for research: civil engineering, architecture and urbanism
Super rig drives super piles
Note on specially rigged driver with all welded 90-ft tower leads which drives steel and concrete piles for Staten Island ferry terminal; pile combines advantages of cast-in-place concrete and H-beam types; corrugated shell is set within outer shell and driven along with steel core; outer shell is pulled after steel section, encased in concrete, has been driven to solid rock.
Super rig drives super piles
Note on specially rigged driver with all welded 90-ft tower leads which drives steel and concrete piles for Staten Island ferry terminal; pile combines advantages of cast-in-place concrete and H-beam types; corrugated shell is set within outer shell and driven along with steel core; outer shell is pulled after steel section, encased in concrete, has been driven to solid rock.
Super rig drives super piles
Construction Methods
1949
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction method for overwater super-long steel sheet piles
European Patent Office | 2021
|Drives shotcrete-encased piles
Engineering Index Backfile | 1945
Drives shotcrete-encased piles
Engineering Index Backfile | 1945
Buckling Analysis of Steel Cylinder in Super Long Bored Piles Construction
Trans Tech Publications | 2013
|Buckling Analysis of Steel Cylinder in Super Long Bored Piles Construction
British Library Conference Proceedings | 2013
|