A platform for research: civil engineering, architecture and urbanism
Alaska contractors build difficult nike sites
Features of construction on 4000 ft high peak; two monolithic concrete launching structures 10,600 sq ft each, and two control buildings of total 34,000 sq ft were built with heating, water, and electrical distribution systems; 8 mi access road was built with nonfrost materials; blasting operations; freezing of water to drill holes; 1/8 in. in 10 ft tolerance in concrete work; heated septic tanks for sewage.
Alaska contractors build difficult nike sites
Features of construction on 4000 ft high peak; two monolithic concrete launching structures 10,600 sq ft each, and two control buildings of total 34,000 sq ft were built with heating, water, and electrical distribution systems; 8 mi access road was built with nonfrost materials; blasting operations; freezing of water to drill holes; 1/8 in. in 10 ft tolerance in concrete work; heated septic tanks for sewage.
Alaska contractors build difficult nike sites
Excavating Engr
Atkinson, E.L. (author)
Excavating Engineer ; 53
1959
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Dealing with Difficult Contractors
Wiley | 2020
|British Library Online Contents | 2003
|Design-build contractors offered coverage
Online Contents | 1996
HELPING CONTRACTORS BUILD ON OPPORTUNITY
British Library Online Contents | 2017
|Design/build contractors offered coverage
British Library Online Contents | 1996