A platform for research: civil engineering, architecture and urbanism
Six deep wells dewater excavation
Excavation works for large lock and bascule bridge being constructed for deep water channel connecting Port of Sacramento with San Francisco Bay, and which will have 21 ft high lift sector gate; to lower groundwater on 498,000 cu yd excavation site, six deep well turbine pumps were provided having 20,000 gpm capacity; 70 ft deep wells were shaft lined with steel casings; earthmoving and concreting works.
Six deep wells dewater excavation
Excavation works for large lock and bascule bridge being constructed for deep water channel connecting Port of Sacramento with San Francisco Bay, and which will have 21 ft high lift sector gate; to lower groundwater on 498,000 cu yd excavation site, six deep well turbine pumps were provided having 20,000 gpm capacity; 70 ft deep wells were shaft lined with steel casings; earthmoving and concreting works.
Six deep wells dewater excavation
Western Construction
Western Construction ; 34
1959
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Deep wells dewater pipeline right-of-way
Engineering Index Backfile | 1965
|Engineering Index Backfile | 1933
Engineering Index Backfile | 1930
Wellpoints dewater below sea level
Engineering Index Backfile | 1948
|Engineering Index Backfile | 1943
|