A platform for research: civil engineering, architecture and urbanism
Enders Dam
Report details all aspects of project; topographic and economic factors; design and construction; dam and dike contain 1.75 million cu yd of earth and rock; crest length is 2603 ft, of dike 6133 ft; purpose of construction is irrigation and flood control; spillway has open concrete channel with concrete gate structure and concrete stilling basin; discharge is controlled by six 50- by 30-ft radial gates.
Enders Dam
Report details all aspects of project; topographic and economic factors; design and construction; dam and dike contain 1.75 million cu yd of earth and rock; crest length is 2603 ft, of dike 6133 ft; purpose of construction is irrigation and flood control; spillway has open concrete channel with concrete gate structure and concrete stilling basin; discharge is controlled by six 50- by 30-ft radial gates.
Enders Dam
US Bur Reclamation -- Technical Record Design Construction.
1958
180 pages
Report
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1951
|Engineering Index Backfile | 1947
|Pumped concrete for enders dam spillway
Engineering Index Backfile | 1949
|Radial Gate Evaluation, Enders Dam, Nebraska
NTIS | 1997