A platform for research: civil engineering, architecture and urbanism
Construction of 1271 ft long steel arch bridge at Glen Canyon Dam, 680 ft above water surface; arch is 1028 ft long and has rise of 165 ft; bridge contains 1975 tons of carbon steel, 800 tons of it in arch and 1550 tons of alloy steel in arch; arch was constructed by using cableway, with two hooks. (see also Civ Eng (NY) v 29 n 2 Feb 1959 p 50-3)
Construction of 1271 ft long steel arch bridge at Glen Canyon Dam, 680 ft above water surface; arch is 1028 ft long and has rise of 165 ft; bridge contains 1975 tons of carbon steel, 800 tons of it in arch and 1550 tons of alloy steel in arch; arch was constructed by using cableway, with two hooks. (see also Civ Eng (NY) v 29 n 2 Feb 1959 p 50-3)
Building Colorado river bridge
Western Construction
Murphy, F.J. (author)
Western Construction ; 33
1958
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Building Colorado river bridge
Engineering Index Backfile | 1959
|Railway bridge over Colorado river
Engineering Index Backfile | 1948
Railway bridge over Colorado river
Engineering Index Backfile | 1949
Mexico building Colorado River Dam
Engineering Index Backfile | 1949
|Rebuilding Colorado river bridge pier after collapse
Engineering Index Backfile | 1929