A platform for research: civil engineering, architecture and urbanism
Teamwork lays Lake Erie pipe
Precasting and laying 10-ft diam concrete water intake pipe 2 1/2 mi long on bottom of Lake Erie for city of Cleveland is described; pipe connects crib 2 1/2 mi from shore to pump station on shore; intake pipe and pump station will have 150 mgd capacity; trailer having three axles and 12 tires on rear was constructed to move pipe sections from forming yard to construction site; pipe was layed from artificial harbor.
Teamwork lays Lake Erie pipe
Precasting and laying 10-ft diam concrete water intake pipe 2 1/2 mi long on bottom of Lake Erie for city of Cleveland is described; pipe connects crib 2 1/2 mi from shore to pump station on shore; intake pipe and pump station will have 150 mgd capacity; trailer having three axles and 12 tires on rear was constructed to move pipe sections from forming yard to construction site; pipe was layed from artificial harbor.
Teamwork lays Lake Erie pipe
Construction Methods Equipment
1957
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New rig lays heaviest precast pipe
Engineering Index Backfile | 1958
A Study of Currents ix Lake Erie At Erie, PA.
Wiley | 1926
|Splashy Competition on Lake Erie
British Library Online Contents | 1997
|Splashy Competition on Lake Erie
Online Contents | 1997
|Short-Term Forecasts for Lake Erie
British Library Conference Proceedings | 1994
|