A platform for research: civil engineering, architecture and urbanism
Heavy pile hammers handle big driving job
Pile driving in construction of bridge between San Rafael and Richmond, Calif involved 5100 steel H-piles, 14 in. by 89 lb up to 201 ft in length for total of 26,000 tons of steel; 1500 fender piles up to 150 ft long and 1200 falsework piles were also driven; three single acting pile hammers were used; they delivered 32,500 ft lb per blow and permitted driving underwater.
Heavy pile hammers handle big driving job
Pile driving in construction of bridge between San Rafael and Richmond, Calif involved 5100 steel H-piles, 14 in. by 89 lb up to 201 ft in length for total of 26,000 tons of steel; 1500 fender piles up to 150 ft long and 1200 falsework piles were also driven; three single acting pile hammers were used; they delivered 32,500 ft lb per blow and permitted driving underwater.
Heavy pile hammers handle big driving job
Roads Streets
Roads and Streets ; 100
1957
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1948
Performance of Pile Driving Hammers
ASCE | 2021
|New pile-driving tubular diesel hammers
Online Contents | 1970
|Engineering Index Backfile | 1929
Engineering Index Backfile | 1919