A platform for research: civil engineering, architecture and urbanism
Bridge costs cut by multiple-use forms and concrete pumping
Construction of double deck roadway for Wacker Drive in Chicago; metal column forms were reused on one section over 30 times, and Rex 34E paver and Pumpcrete unit which could distribute concrete to areas as far away as 500 ft was set up; structure is carried upon subpiers 4 ft in diam.
Bridge costs cut by multiple-use forms and concrete pumping
Construction of double deck roadway for Wacker Drive in Chicago; metal column forms were reused on one section over 30 times, and Rex 34E paver and Pumpcrete unit which could distribute concrete to areas as far away as 500 ft was set up; structure is carried upon subpiers 4 ft in diam.
Bridge costs cut by multiple-use forms and concrete pumping
World Construction
World Construction ; 10
1957
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Concrete costs cut by new forms
Engineering Index Backfile | 1929
|PUMPING A CONCRETE BRIDGE FROM A RIVER BARGE
Online Contents | 1995
Effect of Pumping on Properties of Bridge Concrete
British Library Online Contents | 2000
|Pumping concrete for construction of reinforced concrete bridge 145 m in length
Engineering Index Backfile | 1938
|British Library Conference Proceedings | 1993
|