A platform for research: civil engineering, architecture and urbanism
Precision forms meet close tolerance needs of concrete wind tunnel
Description of method used to maintain tolerances of 1/8 in. in bellmouth of 450-ft continuous return reinforced concrete tube of approximately rectangular cross section, at Boeing Aircraft Co. (see also Concrete v 52 n 7 July 1944 p 2, 3, 8)
Precision forms meet close tolerance needs of concrete wind tunnel
Description of method used to maintain tolerances of 1/8 in. in bellmouth of 450-ft continuous return reinforced concrete tube of approximately rectangular cross section, at Boeing Aircraft Co. (see also Concrete v 52 n 7 July 1944 p 2, 3, 8)
Precision forms meet close tolerance needs of concrete wind tunnel
Construction Methods
1944
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Precision forms meet close tolerance needs of concrete wind tunnel
Engineering Index Backfile | 1944
Modern use of an old tunnel to meet public needs
British Library Conference Proceedings | 1998
|Composites meet infrastructure needs
British Library Online Contents | 1994
FIBRE REINFORCED SPRAY CONCRETE: MINIMUM PERFORMANCE REQUIREMENT TO MEET SAFETY NEEDS
British Library Conference Proceedings | 2015
|Shuttering for concrete wind tunnel
Engineering Index Backfile | 1945