A platform for research: civil engineering, architecture and urbanism
Construction operations on HaifaBeirut-Tripoli Railway, completed by British Army; illustrated description of tracklaying, bridge and tunnel construction.
Construction operations on HaifaBeirut-Tripoli Railway, completed by British Army; illustrated description of tracklaying, bridge and tunnel construction.
Standard-gage railroad
Construction Methods
Tooley, I.P. (author)
1944
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
First welded railroad bridge for standard-gage trains
Engineering Index Backfile | 1930
|Gage Adjusting And Insulation Apparatus For Railroad Construction
European Patent Office | 2017
|Construction of narrow-gage railroad in marshy area
Engineering Index Backfile | 1930
|Standard "overtrack" railroad stations
Engineering Index Backfile | 1890
Earth transportation by means of standard-gage side dump cars
Engineering Index Backfile | 1928
|