A platform for research: civil engineering, architecture and urbanism
Steel sheetpiling protects railroad fill from washout
Extensive protective works involving three separate lines of steel sheet piling, one along upper side of railroad roadbed, second at toe of slope on lake shore and third out in lake to serve as breakwater. (p 78-81, 144, 146, 148, 150, 152, 154, 158, 162)
Steel sheetpiling protects railroad fill from washout
Extensive protective works involving three separate lines of steel sheet piling, one along upper side of railroad roadbed, second at toe of slope on lake shore and third out in lake to serve as breakwater. (p 78-81, 144, 146, 148, 150, 152, 154, 158, 162)
Steel sheetpiling protects railroad fill from washout
Construction Methods
1944
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
|Grouted fill protects breakwater
Engineering Index Backfile | 1948
|Excavation and fill ordnance protects public
Engineering Index Backfile | 1954
|Edgewick Railroad Fill Failure, Washington State, 1932
British Library Conference Proceedings | 2022
|ANTI-WASHOUT UNDERWATER GROUT COMPOSITION, AND ANTI-WASHOUT UNDERWATER GROUT
European Patent Office | 2021
|