A platform for research: civil engineering, architecture and urbanism
"Six points" interchange will solve Toronto traffic bottleneck
Construction and design features of directional interchange which has bridge with hinge-mounting of abutments to footings and deck; hinge effect is achieved by sets of bars anchored in footings crossing at point of contact between footing and abutment and extending diagonally up into abutments; deck structure comprises series of sealed reinforced concrete boxes; boiled linseed oil will be used to protect concrete against corrosion.
"Six points" interchange will solve Toronto traffic bottleneck
Construction and design features of directional interchange which has bridge with hinge-mounting of abutments to footings and deck; hinge effect is achieved by sets of bars anchored in footings crossing at point of contact between footing and abutment and extending diagonally up into abutments; deck structure comprises series of sealed reinforced concrete boxes; boiled linseed oil will be used to protect concrete against corrosion.
"Six points" interchange will solve Toronto traffic bottleneck
Roads Eng Construction
1960
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Boston's Jacked Tunnels Solve Interchange Challenge
British Library Online Contents | 2005
|Transportation: the bottleneck of regional competitiveness in Toronto
Online Contents | 2008
|Structures Worldwide - Boston's Jacked Tunnels Solve Interchange Challenge
Online Contents | 2005
|Engineering Index Backfile | 1946
|