A platform for research: civil engineering, architecture and urbanism
Construction of rocky beach hydroelectric project
4800 ft long dam consists of 450 ft gravity section on west bank, 1100 ft powerhouse section, 375 ft arch section, and 750 ft spillway section in river bed, and 120 ft gravity section and 2000 ft earth dam section on east bank; river diversion, 5,000,0000 cu yd excavations, and 1,000,000 cu yd concreting work; fish ladder at west bank and fish passage along entire river bed section; plant will produce 1.215 Mw by 11 units.
Construction of rocky beach hydroelectric project
4800 ft long dam consists of 450 ft gravity section on west bank, 1100 ft powerhouse section, 375 ft arch section, and 750 ft spillway section in river bed, and 120 ft gravity section and 2000 ft earth dam section on east bank; river diversion, 5,000,0000 cu yd excavations, and 1,000,000 cu yd concreting work; fish ladder at west bank and fish passage along entire river bed section; plant will produce 1.215 Mw by 11 units.
Construction of rocky beach hydroelectric project
ASCE -- Proc (J Construction Div)
Evans, W.N. (author) / Boyd, J.H. (author)
1960
22 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of Rocky Reach Hydroelectric Project
ASCE | 2021
|Construction of Rocky Reach Hydroelectric Project
ASCE | 2021
|Relicensing The Ozark Beach Hydroelectric Project
British Library Conference Proceedings | 1993
|SPECIAL REPORT: SPOTLIGHT ON ROCKY REACH HYDROELECTRIC PROJECT
Online Contents | 1997